Loading...
 

Nuevo Vallarta Update and Tower 5 Progress - Frank_J

March 18, 2016

Frank_J was in Nuevo Vallarta during the week of March 12, 2016 and he sent us photos:
  • Of the maps on the Sales Department's Wall
  • Of construction progress at Tower 5
  • Of changes taking place on the north side of Towers 3 and the SPA Towers
  • Of a new structure that looks like it could be a taxi stand
  • Update - the Punta Tower Mystery Construction
Terrific impressions of the progress being made and the changes taking place!
Bob and Mary Ann,

This message is intended to provide an update regarding Building 5A at Vidanta Nuevo Vallarta.

During an update meeting we were told the following regarding this area of the resort:
  • Building 5A now under construction is the first of nine buildings to be built in this area, referred to as buildings 5A & 5B, 6A & 6B, 7A & 7B, 8A & 8B and 9


desc
This photo shows the map of Vidanta's plans for its Nuevo Vallarta Timeshare property. The map is on the Sales Department wall in the Grand Bliss. Tower 5A is under construction and shown with a large rooftop pool and followed eastward by "winged" buildings that sales personnel say are to be built. It is closest to the Residence Tower. The Residence Tower is the last tower in the chain of towers that begins at the beach and follows the Ameca River. Towers 5B, 6A, 6B, 7A, 7B, 8A, 8B and 9 are the structures sales personnel say will be built east of Tower 5A after Tower 5A opens in late 2016 or early 2017.
desc
This photo shows the model of Grupo Vidanta's property in Nuevo Vallarta, Mexico. Tower 5A is currently under construction and shown with a large rooftop pool and is followed eastward by "wing" shaped buildings. It is closest to the Residence Tower. The Residence Tower is the last tower in the chain of towers that begins at the beach and follows the Ameca River. Towers 5B, 6A, 6B, 7A, 7B, 8A, 8B and 9 are the structures sales personnel say will be built east of Tower 5A after Tower 5A opens in late 2016 or early 2017.



  • Building 5A will have a pool on top that is 5 times larger than the Residence pool and it will have seating all around it
  • Building 5A will be 18 feet taller than the Residence building (?)
  • Building 5A will have 9 floors above the PB level and the top floor will contain 1 bedroom GL Loft units
  • Fitness/workout facilities will be provided on one of the floors of 5A
Attached are several photos of Building 5A and of resort layout plans (showing the possible layout of the future buildings) taken on March 10th.

We’ll be here until the 18th if there are any details that I could explore for the group.

Frank

Frank's next email said:

Bob, I was finally able to get back in touch with my contact to confirm the following details pertaining to Building 5A:
  • The 1 BR Loft units (sleeps 4) will occupy two stories just like the current 2 & 3 BR units and they will be situated at the top of the building
  • There will be 40 of the 1 BR Loft units in building 5A
  • Below the 1 BR Loft units will be a floor of Studio Loft units (sleeps 2)
  • They are targeting a soft opening of building 5A in December 2016
View From the SPA Tower

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
Tower 5 as seen from the SPA Tower.
Tower 5 as seen from the SPA Tower.
/////
Closer View of Floors in Tower 5A.
Closer View of Floors in Tower 5A.
/////
Close-up View of West End of Tower 5A.
Close-up View of West End of Tower 5A.
/////
Close-up View of Top Floors of Tower 5A.
Close-up View of Top Floors of Tower 5A.
/////
Close-up View of Residence Two Story 1 BR Loft Space Under Construction.  Note the Open Space Between the Steel IBeam Above the Worker and the Concrete Interior Floor.
Close-up View of Residence Two Story 1 BR Loft Space Under Construction. Note the Open Space Between the Steel IBeam Above the Worker and the Concrete Interior Floor.
/////
Close-up View of Luxxe 1 Room Studio Loft Space Under Construction.  Note the Circular Dippiing Pools on the Deck.
Close-up View of Luxxe 1 Room Studio Loft Space Under Construction. Note the Circular Dippiing Pools on the Deck.
{SLIDER}


View From the Residence Walkway

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
Tower 5 as seen from the walkway near the Residence Tower
Tower 5 as seen from the walkway near the Residence Tower
/////
Two Story, 1 BR Loft Floors in Tower 5 A.
Two Story, 1 BR Loft Floors in Tower 5 A.
/////
Closer View - Two Story, 1 BR Loft Floors in Tower 5 A.
Closer View - Two Story, 1 BR Loft Floors in Tower 5 A.
/////
Closest View - Two Story, 1 BR Loft Floors in Tower 5 A.
Closest View - Two Story, 1 BR Loft Floors in Tower 5 A.
{SLIDER}

Associated with these 9 new buildings will be a new La Plaza that will be 23 times as large as the existing La Plaza (this appears as a somewhat circular structure in the layouts).

With regard to the train system, the existing train is too small to accommodate the anticipated volume of people to be moved. This will be replaced with a new light rail transit system as used in major cities. The new ‘tunnel’ we travel through in taxis to and from the property is actually the ‘support’ for the new rail lines that will pass over the vehicle roadway.

I trust this helps everyone.

Frank

Franks' last email:

Attached is one more picture of Tower 5A taken from a different location – from the 9th floor of the Grand Mayan. (If you zoom in you can count the number of workers on the north side!)

View From the Grand Mayan through High Resolution Lens

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
Tower 5A as seen from the Grand Mayan through a very good camera and lens.
Tower 5A as seen from the Grand Mayan through a very good camera and lens.
/////
A new structure is under construction on the east side of Tower 5A.  This photo shows the progress ofwhat looks to be the
A new structure is under construction on the east side of Tower 5A. This photo shows the progress ofwhat looks to be the
/////
Closer View - Two Story, 1 BR Loft Floors in Tower 5 above the one story ,one room Luxxe Studio Lofts.
Closer View - Two Story, 1 BR Loft Floors in Tower 5 above the one story ,one room Luxxe Studio Lofts.
/////
Closer View - One story Luxxe Studio Lofts..
Closer View - One story Luxxe Studio Lofts..
{SLIDER}


Also, someone had mentioned a ‘bridge to nowhere’ being built on the south side of the Punta building – the second two photos indicate the work in this area is probably just reconstruction of the canal bank. The ‘boxes’ in the water are simple ‘barges’ being used to ferry dirt from the south side of the canal to the north side where it is being placed on the bank. No sign of anything that would suggest a bridge is being built.

"Bridge To Nowhere" - South Side of the Punta Tower

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
Work along the south side of the Punta Tower is still a mystery.  The work seems to be maintenance related or enhancements to the area.
Work along the south side of the Punta Tower is still a mystery. The work seems to be maintenance related or enhancements to the area.
/////
Work along the south side of the Punta Tower is still a mystery.  The work seems to be maintenance related or enhancements to the area.
Work along the south side of the Punta Tower is still a mystery. The work seems to be maintenance related or enhancements to the area.
/////
Work along the south side of the Punta Tower is still a mystery.  The work seems to be maintenance related or enhancements to the area.
Work along the south side of the Punta Tower is still a mystery. The work seems to be maintenance related or enhancements to the area.
/////
Work along the south side of the Punta Tower is still a mystery.  The work seems to be maintenance related or enhancements to the area.
Work along the south side of the Punta Tower is still a mystery. The work seems to be maintenance related or enhancements to the area.
/////
Work along the south side of the Punta Tower is still a mystery.  The work seems to be maintenance related or enhancements to the area.
Work along the south side of the Punta Tower is still a mystery. The work seems to be maintenance related or enhancements to the area.
{SLIDER}


Finally, the latest site layout plans show a series of ponds north of buildings 3 and 4 – no golf course. But, the canal system appears to be contiguous from the Punta point to beside the Residence tower (but not all the way to the Spatium).

Area North of the SPA Towers and Towers 3A and 3B - Lagoons or Executive Golf Course?

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
Resort Development Plan from the Sales Department Wall in the Grand Bliss.
Resort Development Plan from the Sales Department Wall in the Grand Bliss.
/////
Earth moving projects in lagoons near the Spatium.  No gondolas from the Spatium to the Grand Bliss to the Punta Tower.
Earth moving projects in lagoons near the Spatium. No gondolas from the Spatium to the Grand Bliss to the Punta Tower.
/////
Closer look at earth moving projects in lagoons near the Spatium.  No gondolas from the Spatium to the Grand Bliss to the Punta Tower.
Closer look at earth moving projects in lagoons near the Spatium. No gondolas from the Spatium to the Grand Bliss to the Punta Tower.
{SLIDER}


One More Mystery Building - Taxi Stand or Golf Starting House?

{SLIDER(resizecontents="n" width="575px" expand="n" showmultiple=1 buildarrows="n" buildnavigation="y" buildstartstop="n" autoplay="n" animationtime=60)}
A new structure near the Residence Tower - Taxi Stand or Golf Starting Location?
A new structure near the Residence Tower - Taxi Stand or Golf Starting Location?
/////
Close-up view of a new structure near the Residence Tower - Taxi Stand or Golf Starting Location?.
Close-up view of a new structure near the Residence Tower - Taxi Stand or Golf Starting Location?.
{SLIDER}


This will be all my comments for this trip – it has been great exchanging messages with you again.

Frank

Thank you Frank. We all appreciate your time and photos and you sharing them with us all....Changes continue, and we will all....stay tuned....
Return to Current News ...OR... Return to Photos and Videos